The first step is lining up and leveling the baseplates to make sure everything else runs smooth. |
As if the tent itself wasn't enough, we laid down over 20,000 sq. ft. of flooring along with numerous other catering and entrance tents.
We made custom sidewall to allow the gable 15x20 connecter to flow seamlessly into the Losberger |
The Finished Product
We couldn't help ourselves from making our way to the top of the building across the street for some prime pictures. |
Nice view down Broad Street |
No comments:
Post a Comment