| The first step is lining up and leveling the baseplates to make sure everything else runs smooth. |
As if the tent itself wasn't enough, we laid down over 20,000 sq. ft. of flooring along with numerous other catering and entrance tents.
| We made custom sidewall to allow the gable 15x20 connecter to flow seamlessly into the Losberger |
The Finished Product
| We couldn't help ourselves from making our way to the top of the building across the street for some prime pictures. |
| Nice view down Broad Street |
No comments:
Post a Comment